Saltar al contenido principal

Repara tus cosas

Derecho a reparar

Partes y herramientas

Inglés
Español
Paso 9
Before re-installing the primary chain inspection cover, make sure the rubber O-ring on the inside of the primary chain inspection hole is clean and properly seated. Also make sure that the rubber o-rings are clean and in proper condition before replacing the screws in the primary chain inspection cover. Using a 5/32" Hex or Allen screw head, re-install the primary chain inspection cover.
Re-assembly
  • Before re-installing the primary chain inspection cover, make sure the rubber O-ring on the inside of the primary chain inspection hole is clean and properly seated.

  • Also make sure that the rubber o-rings are clean and in proper condition before replacing the screws in the primary chain inspection cover.

  • Using a 5/32" Hex or Allen screw head, re-install the primary chain inspection cover.

Antes de volver a instalar la cubierta de inspección de la cadena primaria, asegúrate de que la junta tórica de goma en el interior del orificio de inspección de la cadena primaria esté limpia y asentada correctamente.

Asegúrate también de que las juntas tóricas de goma estén limpias y en buen estado antes de volver a colocar los tornillos en la cubierta de inspección de la cadena primaria.

Con una cabeza de tornillo hexagonal o Allen de 5/32 ", reinstala la cubierta de inspección de la cadena primaria.

Tus contribuciones son autorizadas bajo la licencia de código abierto de Creative Commons.