Saltar al contenido principal
Inglés
Español
Paso 2
Make sure the machine is turned off and unplugged.
  • Make sure the machine is turned off and unplugged.

  • Set your voltmeter in continuity mode and place the leads on the two 90 degree prongs on the boiler's heating element.

  • It does not matter which lead touches which prong as you're just testing for a break, or "open" in the heating element circuit.'''

  • If the voltmeter shows 0, or "open", then there is an issue with the heating element's continuity and it needs to be replaced.

  • If given a reading, then your heating element is fine.

Insertar traducción aquí

Insertar traducción aquí

Insertar traducción aquí

Insertar traducción aquí

Insertar traducción aquí

Tus contribuciones son autorizadas bajo la licencia de código abierto de Creative Commons.