Saltar al contenido principal

MSI GE72 6QF Apache Pro SSD Replacement

Qué necesitas

  1. MSI GE72 6QF Apache Pro SSD Replacement, Battery: paso 1, imagen 1 de 2 MSI GE72 6QF Apache Pro SSD Replacement, Battery: paso 1, imagen 2 de 2
    • Make sure the laptop is off and unplugged (not charging).

    • With the laptop closed and upside down, unscrew the nineteen 5.5mm Phillips #1 screws that keep the back cover in place.

  2. MSI GE72 6QF Apache Pro SSD Replacement: paso 2, imagen 1 de 1
    • Slide the optical drive out of the laptop.

  3. MSI GE72 6QF Apache Pro SSD Replacement: paso 3, imagen 1 de 1
    • Use a Phillips screwdriver to remove the three screws along the edge of the optical drive bay.

  4. MSI GE72 6QF Apache Pro SSD Replacement: paso 4, imagen 1 de 2 MSI GE72 6QF Apache Pro SSD Replacement: paso 4, imagen 2 de 2
    • Using your fingers, gently loosen the edges of all four sides of the back cover.

    • Gently pull off the back cover.

  5. MSI GE72 6QF Apache Pro SSD Replacement: paso 5, imagen 1 de 2 MSI GE72 6QF Apache Pro SSD Replacement: paso 5, imagen 2 de 2
    • Unscrew the single 5.5mm Phillips #1 screw keeping the battery secure.

  6. MSI GE72 6QF Apache Pro SSD Replacement: paso 6, imagen 1 de 2 MSI GE72 6QF Apache Pro SSD Replacement: paso 6, imagen 2 de 2
    • Grab the battery with your fingers and gently pull it up and away from the rest of the laptop.

  7. MSI GE72 6QF Apache Pro SSD Replacement, SSD: paso 7, imagen 1 de 2 MSI GE72 6QF Apache Pro SSD Replacement, SSD: paso 7, imagen 2 de 2
    • Remove the single 5.5mm Phillips #1 screw attaching the SSD to the laptop.

  8. MSI GE72 6QF Apache Pro SSD Replacement: paso 8, imagen 1 de 2 MSI GE72 6QF Apache Pro SSD Replacement: paso 8, imagen 2 de 2
    • Pull out the SSD by gently wiggling it from side to side until it comes out.

    • If the old SSD you removed contains the operating system, then the new SSD must also contain an operating system.

Conclusión

To reassemble your device, follow these instructions in reverse order.

7 personas más completaron esta guía.

Tanmay Kumar

Miembro Desde 04/17/17

458 Reputación

4 Guías creadas

Equipo

Cal Poly, Team S14-G4, Banghart Spring 2017 Miembro de Cal Poly, Team S14-G4, Banghart Spring 2017

CPSU-BANGHART-S17S14G4

4 Miembros

8 Guías creadas

0 comentarios

Agregar Comentario

Ver Estadísticas:

Ultimas 24 horas: 3

Ultimos 7 días: 17

Ultimos 30 días: 50

Todo El Tiempo: 7,663