Saltar al contenido principal

Honeywell MultiRae Hydrogen Sulfide Electrochemical Sensors Replacement

Qué necesitas

  1. Honeywell MultiRae Hydrogen Sulfide Electrochemical Sensors Replacement, Electrochemical Sensors: paso 1, imagen 1 de 1
    • Confirm which sensor you are intending to replace. Make note of it.

    • Nitrile gloves should be worn for the entire procedure.

  2. Honeywell MultiRae Hydrogen Sulfide Electrochemical Sensors Replacement: paso 2, imagen 1 de 2 Honeywell MultiRae Hydrogen Sulfide Electrochemical Sensors Replacement: paso 2, imagen 2 de 2
    • Place the monitor face down on a clean surface.

    • Use the Phillips #0 screwdriver to remove the single 3 mm Phillips screw on the belt clip.

  3. Honeywell MultiRae Hydrogen Sulfide Electrochemical Sensors Replacement: paso 3, imagen 1 de 1
    • Starting at the bottom of the case, pull the outer case away from the main body of the monitor.

    • Continue pulling out and away until the entire outer case has been removed.

  4. Honeywell MultiRae Hydrogen Sulfide Electrochemical Sensors Replacement: paso 4, imagen 1 de 1
    • With the Phillips #0 screwdriver, remove all four 3 mm screws from the rear pump/sensor cover.

  5. Honeywell MultiRae Hydrogen Sulfide Electrochemical Sensors Replacement: paso 5, imagen 1 de 1
    • Remove the outer pump/sensor housing cover and set it aside.

  6. Honeywell MultiRae Hydrogen Sulfide Electrochemical Sensors Replacement: paso 6, imagen 1 de 1
    • Carefully grip and twist the outer edge of the sensor to remove the sensor from its insertion point.

    • Be careful not to twist too aggressively as this could damage the sensor attachment point in the monitor.

  7. Honeywell MultiRae Hydrogen Sulfide Electrochemical Sensors Replacement: paso 7, imagen 1 de 3 Honeywell MultiRae Hydrogen Sulfide Electrochemical Sensors Replacement: paso 7, imagen 2 de 3 Honeywell MultiRae Hydrogen Sulfide Electrochemical Sensors Replacement: paso 7, imagen 3 de 3
    • Grip the replacement sensor on the outer edge.

    • Insert the new sensor in a straight downward orientation.

    • Be careful to line up the prongs with their insertion/attachment point in the monitor.

  8. Honeywell MultiRae Hydrogen Sulfide Electrochemical Sensors Replacement: paso 8, imagen 1 de 1
    • Reassemble the unit in reverse order.

    • After reassembly, power the unit on to ensure that the monitor recognizes the new sensor.

    • Calibrate the sensor per the manufacturer's instructions.

Conclusión

To reassemble your device, follow these instructions in reverse order.

0 comentarios

Agregar Comentario

Ver Estadísticas:

Ultimas 24 horas: 1

Ultimos 7 días: 10

Ultimos 30 días: 35

Todo El Tiempo: 786